top of page

Bidding for Defence equipment business

  • bob collins
  • Jan 8, 2023
  • 1 min read

In my most recent post, I used this symbol to represent the deliverable, Packaging Handling, Storage & Transportation Plan. In that post, the symbol is nested in a larger deliverable - the Outline Integrated Support Plan.

The post illustrated the scope and type of effort required to get the engineering part of the tender completed, often in a short time scale. This example is for a small land-based Defence equipment system.

Here is a list of the other deliverables you might need to submit with a tender; at least in outline;

Integrated Support Plan, which includes;

Maintenance Support and Critical Items List

Maintenance Support Concept

Test Plan

Training Program Plan

Operational Replenishment Plan

Maintenance Tasks

Logistic Support Analysis, Hardware and FMECA

“ “ “ Software and FMECA

Hazardous Items List

Support Equipment List

Supply Support Program

Packaging, Handling, Storage & Transportation Plan

Special Tools and Test Equipment

Special Items List

Integrated Logistic Support Progress Report

Through Life Costs

Safety Equipment Program Plan


Reliability and Maintainability Program Plan which includes;

R&M Case Hardware and Software

R&M Data OTS (commercial equipment)

R&M Test Plan

Equipment Breakdown Structure

Environmental Test Program Plan

Human Engineering Program Plan

Technical Publications Program Plan


At Sentio Voci we have been advising on all these deliverables for many years.

 
 
 

Recent Posts

See All

Comments


bottom of page